Financing options are available from the below lenders. Select a lender for additional information.
Permit costs average around $5,000 for parks.
ADU's can only be installed on private property.
Not sure where to start? Our Budget Builder Tool can help you figure out how much your project will cost in 5 minutes or less. *Please note that the Budget Builder Tool is for estimation purposes only.
The home will sit approximately 28-36" above ground and require handmade stairs (4-5 steps).
The home will sit approximately 28-36" above ground and require handmade stairs (4-5 steps).
The cost of a carport will depend on the size of the home you select. The cost starts at $6,000. Driveway costs start at $7,000. The cost will depend on the distance of the home from the road, park requirements, and current site condition.
Driveways can cost anywhere from $15,000 to $100,000 on private property. The cost will depend on the distance of the home from the road, engineering requirements, and current site condition. Parks cost considerably less with an average of $7,000.
Grading costs will depend on numerous factors, including the property location and slope, foundation system, soil engineering plans, etc. Prices start at $25,000.
Utility costs include water lines, electric lines and poles, etc. The average price is between $20,000 to $55,000 per site.
Select a skirting option
avg. cost of $20,000
avg. cost of $6,000
Our design consultants can help you find the ideal floorplan. Please answer a few questions about yourself so we can assist you better.
Select a skirting option
avg. cost of $20,000
avg. cost of $6,000
Permit costs start at $10,000. Permit costs are higher on private property than in a mobilehome park.
Septic engineering and installation starts at $25,000. Price will depend on various factors including county requirements, home location and size.
Customizations start at $20,000 , but can easily exceed that depending on the options you choose.
Select all that apply.
This home will be the main home on the property it is being installed on.
Accessory Dwelling Units (ADUs), also known as granny flats, in-law units, backyard cottages, secondary units, etc. The maximum size of an ADU in both San Diego and Riverside County is 1,200 square feet.
Removing an old home will add time and cost to your budget. The amount charged is based on the number of sections and starts at $5,000 per section.
The home will sit approximately 28-36" above ground and require handmade stairs (4-5 steps).
The home will sit approximately 8-12" above ground and require two cement steps.
Permanent foundations allow you to obtain traditional financing including FHA and VA loans. Permanent foundations are also more expensive. Geotechnical or "soil" testing, grading engineering and grading plans will be required to obtain permits and install a permanent foundation on your property.
The final estimated price is :
Description | Information | Quantity | Price |
---|---|---|---|
Discount : | |||
Total : |